hardel-le-bihan-projets-croisset-schnepp-renou-5.jpg

Social housing Croisset, Paris

A short distance from the Clignancourt university campus, this building of 63 housing units is part of a development composed of two apartment buildings and a university cafeteria. The massing, arranged to ensure porosity from north to south, allows the sun through onto the tree-lined Rue de Croisset. In creating a large, south-facing open area at the middle of the development and a meadow on the roof of the restaurant, we were seeking to adhere to the original spirit of the greenbelt, which is now undergoing extreme densification. Compactness, slit, cut at an angle on the corner of the site, our project gives a new reading of the architectural language of the surrounding buildings of low-cost housing in order to improve urban comfort, optimise living space and provide higher levels of glazing in the facades. Very compact, the building is elongated by studied use of a second, lightweight skin that highlights its verticality. Following aesthetic principles based on how things are used, a network of balconies, seemingly random through its play of single and double heights, is orchestrated on the very rational grid of floor plans. This alternating arrangement enlivens the facades, allows maximum sunlight into the apartments and rationalises the surfaces of the balconies. On the garden side, the textured concrete gives a relief to the otherwise flat facade through a play of shadow and light. Its unevenness echoes the network motif of the road-side facades.

Location
Avenue de la Porte de Clignancourt Paris 18
Programme
103 social-housing units (63 by Hardel Le Bihan), shops, parking for 77 cars, university cafeteria
Client/developer
Paris Habitat, CROUS
Team
Hardel Le Bihan Architectes (Pascaline Gasc project leader), Gaëtan Le Penhuel & Associes (mandatory architect: 40 housing units and university cafeteria), ID+ (engineers), RFR Elements (sustainability), Fayat (general contractor)
Surface area
4 538 m² GIA, 390 m² GIA retail (in a total of 9,070 m² GIA)
Cost
18,6 M€
Calendar
completion April 2018
Materials
concrete and prefabricated concrete
Architectural team
Project manager(s)
Pascaline Gasc (concours, études, chantier)
2018 Housing Paris Prefabrication Social housing
hlb-projets-bobigny-j1-avenue-de-paris2.jpg

Housing Bobigny

Bobigny Co-conception Housing Mixed use On site School Social housing
hardel-le-bihan-projets-bureaux-klesia-strato-4.jpg

Strato Office building, Paris

2013 Company headquarters Office Paris Prefabrication
hlb_p350_cite-creative_coworking_restaurant.jpg

Logements coliving Montpellier

Coliving Housing In progress Montpellier Prefabrication Timber construction
p221-hlb-hotel-citizen-m-crop-face.jpg

Hotel citizen M, Paris

2023 Facility Hospitality Paris Prefabrication